Everything You Need to Get Grid Connected — Done For You
Submitting a DNO application sounds simple. In reality, it means navigating different portals for different network operators, knowing when a G98 notification is enough and when a full G99 application is required, providing the correct technical specifications, and then waiting — and chasing. We handle all of it.
What We Do
G98 Notifications
Up to 3.68kW/phaseFor systems up to 3.68 kW per phase — the standard for single-phase domestic installs.
We complete and submit the G98 notification to your DNO Correct for single-phase domestic installs Turnaround: typically 24–48 hours Confirmation forwarded directly to you
G99 Applications
Over 3.68kW/phaseFull DNO application for larger or commercial solar systems requiring formal approval.
We prepare technical documentation and manage the submission Direct liaison with the DNO engineering team on your behalf Includes follow-up and chasing until approved Commercial and large residential systems covered
Export Number Retrieval
Required for Smart Export Guarantee registration — we get it and pass it straight to you.
We obtain your export number from the DNO after approval Required for Smart Export Guarantee registration Forwarded directly to you or your customer
Multi-Job Packages
5+ jobs/monthFor installers running multiple jobs at once — bulk pricing and dedicated support.
Bulk submission pricing Dedicated account manager Priority turnaround
Every UK Distribution Network Operator
No matter where your installation is in the UK, we've got you covered.
We Handle the Technical Side Too
DNO applications often require technical documentation that goes beyond a simple form fill. We prepare and manage it all.
-
Single Line Diagrams (SLD)
-
G99 feasibility and connection offers
-
Protection relay settings
-
Battery storage declarations
-
EV charger load declarations alongside solar
Ready to hand off your DNO applications?
Send us your first job and see how straightforward it can be.
Get Started